Reports


 
 

Show ALL

 
 

Show only International: Country Report | Annual Report | Newsletter | Funded Research Report

 
 

Show only Domestic: Departmental Annual Report | Departmental Newsletter | Funded Research Report

 
 

Title:

LAKE H. NEELY HENRY PHASE I DIAGNOSTIC/FEASIBILITY STUDY


Author(s):

Bayne, D., W. Seesock, E. Reutebuch and D. Watson


Date: 1997


Funding Agency: U. S. Environmental Protection Agency and Alabama Department of Environmental Management


Keywords: H. neely henry, reservoir, limnology, water quality, pollution


Category: Domestic Funded Research Report


Download: Download


Summary/Recommendations/Objectives:

Lake Neely Henry was chosen for

 

a Phase I, Clean Lakes,


Diagnostic/Feasibility Study based on the results of several previous studies
that showed degraded water quality and toxic contamination of the lake from point
and nonpoint sources of pollution. The objectives of this study were to gather
historic and current data on Lake Henry, identify water quality problems and
determine feasible solutions for their correction.

203 Swingle Hall | Auburn, Alabama 36849 | (334) 844-4786 |
Website Feedback | Privacy | Copyright ©