Auburn University
Auburn University
Future Students Current Students Fisheries Image Gallery COAG Home
Auburn University
 Home/Search

Search


Found: 20 image(s) on 4 page(s). Displayed: image 1 to 6.

A view of construction in progress in the late summer 1940 on the F series of ponds.
A view of construction in progress in the late summer 1940 on the F series of ponds. (stonema)
Facilities

An early attempt, about 195_, to construct a plastic house over a plastic lined pond to overwinter Tilapia.
An early attempt, about 195_, to construct a plastic house over a plastic lined pond to overwinter Tilapia. (stonema)
Facilities

As the construction on F. P. 6 progressed the shaping and packing of the fill material in the dam was aided by the use of mules and slip scrapes.
As the construction on F. P. 6 progressed the shaping and packing of the fill material in the dam was aided by the use of mules and slip scrapes. (stonema)
Facilities

Bo Tarver pushing dirt to build dam on farm pond 6 in 1941.
Bo Tarver pushing dirt to build dam on farm pond 6 in 1941. (stonema)
Facilities

Bulldozer clearing dam site for S-13.
Bulldozer clearing dam site for S-13. (stonema)
Facilities

Constructing concrete dam across stream. 1940
Constructing concrete dam across stream. 1940 (stonema)
Facilities


1  2  3  4  »  Last page »

Images per page: 

 

 

Powered by 4images 1.7.6
Questions? Comments? Please e-mail the webmasterAuburn University ·