Departmental Reports


Title:

WEST POINT LAKE PHASE I DIAGNOSTIC/FEASIBILITY STUDY
FINAL REPORT



Author(s):

Bayne, D., W. Seesock and E. Reutebuch



Date: 1994



Funding Agency: U. S. Environmental Protection Agency and Fuller E. Callaway Foundation



Keywords: west point, reservoir, water quality, limnology, pollution



Category: Domestic Funded Research Report



Download: Download



Summary/Recommendations/Objectives:

West Point Lake was chosen for

 

a Phase I, Clean Lakes.


Dia~ostic/Feasibility

 

Study based on several studies that showed accelerated


eutrophication resulting from excessive nutrient loading. The objectives of this
study were to provide historic and current data on West Point Lake, identify
water quality problems and determine feasible solutions for their correction.

203 Swingle Hall | Auburn, Alabama 36849 | (334) 844-4786 |
Website Feedback | Privacy | Copyright ©